摘要 |
PURPOSE:To automatically and surely execute date transfer by executing date transfer by the initial subject detecting signal obtained after changing a date, and when either one of prescribed signals is not supplied, disabling the date transfer operation. CONSTITUTION:When a power supply switch is turned on in the next day after ending the photographing work of the day and turning off the power supply switch, date change is executed by a clock circuit 24 and an FF circuit 27 is set up. However, an FF circuit 39 is reset by an initial reset circuit 28, so that an AND gate 30a is closed. When a subject is carried under said status, the gate 30a is opened and date transfer can be automatically executed. When the circuit 27 is set up by a switching means 104 for selecting a film cutting circuit 101, a trailer carrying circuit 102 and a development starting circuit 103 respectively after the end of one patch photographing, date transfer is automatically executed by the succeeding one patch subject carrying.
|