发明名称 EXECUTING METHOD FOR WORK FOR SLOPE FRAME
摘要 PURPOSE:To prevent a slope frame from floating, by casting mortar from above a lattice frame, after the lattice frame is formed on the face of slope with the lower section of the free ends of the side sections, and with the frame material of end-surface-upside-down U type consisting of a ceiling section and side sections formed with the material of many spaces. CONSTITUTION:The frame material 5 of end-surface-upside-down U type is formed with the ceiling section 1 of many spaces and the side sections 2 of many spaces. Then, after anchors 7 are driven on the surface of slope at adequate intervals, a reinforcement 9 is mounted on the bearing section 8 of the anchor 7 reinforcement t be fixed. Then, after a lattice frame is formed to cover the reinforcement 9 with the frame material 5 from above, mortar or concrete is cast from above the lattice frame, and a slope frame is formed.
申请公布号 JPS62121235(A) 申请公布日期 1987.06.02
申请号 JP19850260752 申请日期 1985.11.19
申请人 NISSHOKU CORP;NIPPON FUERASU KOGYO KK 发明人 TANIGUCHI MITSUO;HORI KANAME
分类号 E02D17/20 主分类号 E02D17/20
代理机构 代理人
主权项
地址