摘要 |
This process and this installation permit taking samples of blast-furnace gas from a series of orifices (T1, T2 . . . ) located at different levels along a generatrix of the body of the blast-furnace. There are performed, in sequence, operations for preparing sampling lines, operations for the analysis of the gases in a device (G), and pressure measuring operations in a pressure sensor (P). These various operations are managed by a programmable automaton (A) and the data obtained are used in a computer (C) in accordance with an embodiment of the installation.
|