发明名称 CONSTRUCTION METHOD FOR CUT-OFF WALL
摘要 PURPOSE:To build a cut-off wall which is endurable to the crack and deformation of ground due to earthquake, by a method wherein the cut-off wall ditch is excavated by means of low specific gravity muddy water, and the low specific gravity muddy water is replaced through a tremie tube with a stress transfer member such as high specific gravity muddy water, cobble-stone. CONSTITUTION:A ditch 1 is excavated by means of low specific gravity muddy water 2. A tremine tube 5 is inserted to the bottom of the ditch 1 and high specific gravity muddy water 3 is poured, and simultaneously, large cobble-stone 4, having specific gravity sufficiently higher than that of low specific gravity muddy water, is charged in the ditch 1. The cobble stone is densely pile up in the ditch 1. An alternate method, wherein premixture of the cobble-stone 4 and the high specific gravity muddy water 3 is poured through the tremie tube 5 to build a cut-off wall, is proposed. This builds a cut-off wall which is mixed with massive stress transfer members and durable to earthquake and deformation of the ground.
申请公布号 JPS60105707(A) 申请公布日期 1985.06.11
申请号 JP19830212394 申请日期 1983.11.14
申请人 TAISEI KENSETSU KK 发明人 KODERA HIDENORI;SAKAMI TAKUYA;MURAMATSU MASASHIGE;NAKAO KENJI;NAGURA KATSUHIRO
分类号 E02D5/18;(IPC1-7):E02D5/18 主分类号 E02D5/18
代理机构 代理人
主权项
地址