摘要 |
<p>PURPOSE:To prevent an operational error such as an inadvertent one, by successively starting and stopping the operation machineries of an electric precipitator according to the time schedule set to a timer by the detection signal of an operational state other than the electric precipitator. CONSTITUTION:A DC high voltage generator 21, glass heaters 22a, 22b and glass air cleaning equipment 23 are arranged to the electric precipitator 20 for a batchwise incinerator and electrode hammering devices for shaking off the dusts respectively adhered to the positions of a dust collecting electrode and a discharge electrode are further arranged. A control panel 30 for operating each operation machinery is constituted of a sequencer 31 and an operation switch 32 and the sequencer 31 is set so as to start and stop the aforementioned each operation machinery according to predetermined start order. The operation of each operation machinery of the electric precipitator 20 to the charging of garbage is enabled by one operation switch 32.</p> |