摘要 |
The tunnel (20) or similar underground rock chamber has holes (23-25) drilled to connect with it for fresh water feed from adjacent crushing zones in the rock. Pumping house (27) is provided to lower the fresh water temp. to the required level to achieve a density of 1 or thereabouts. |