摘要 |
<p>Sheet materials (8, 9) is fed from a sheet supply station (7) to a sheet receiving station (2) and is guided by guiding means (3-6) which defines the floor as well as the side walls of a spray chamber. The sheet material can be replaced when soiled by advancing a new length from the supply station (7) to the receiving station (2).</p> |