摘要 |
The control system comprises a central processing device for providing an operation plan for a number of trains and operation control instructions for the trains which are operated according to the operation plan which is centrally positioned. Terminal processing devices are so connected that data communication can be performed between the central processing device and the terminal processing devices are installed at a number of train stations located in the operation area of the trains so that the terminal processing devices track the trains and control their courses. The terminal processing devices can provide instructions to simulate the control of the courses of the trains and the running of the trains according to instructions given by an automatic train control device. The central processing device receives a start instruction to simulate the running and the course control of the trains and all terminal processing devices start simulation devices simultaneously. - The terminal processing device at the first station from which a train starts first transmits through an N:N data transmission system to a second station which is next to the first the train departure data of the previous station which is obtained by operating a station control logic of the course control and the departure control of the train and the simulation course control. Upon reception of the departure data, the terminal processing data at the second station performs the simulation running calculation, detection, and interlocking logic of the train, and after confirming the functions of tracking and controlling the course of the train, transmits the departure data of the train leaving the second station to the third station which is located next to the second. (2/8) |