发明名称 Procedure for constructing house - house is made from prefabricated elements and has factory made finishing to reduce site work assembly
摘要 The base of the house (1) has a horizontal upper surface and prefabricated load bearing units at least forming the exterior walls and the interior partitions. The in-situ base has horizontal metal profiles (5) on its periphery which are given assembly devices for fixing the exterior walls (10) and a concrete slab (7) is cast inside the profiles. - Factory made prefabricated load bearing panels are given assembly fixations, carpentry gear, thermal insulation, and conduits. Ground or wall claddings are provided in or on the panels. The panels are placed on the base and are joined to it and/or to each other.
申请公布号 BE905580(A1) 申请公布日期 1987.02.02
申请号 BE19860217277 申请日期 1986.10.09
申请人 PROMILIA 发明人
分类号 E04B1/10;(IPC1-7):E04B/;E04C/;F16S/ 主分类号 E04B1/10
代理机构 代理人
主权项
地址