发明名称 Sagging tram ore rail track repair method - corrects subsidence by lifting track and sleepers and filling space by quick-setting mortar mixt. including aluminium oxide cement
摘要 <p>The method is for correcting sagging rails or road surfaces due to subsidence. It comprises lifting the track from above, forming a space underneath. This space is filled with quick setting mortar, being below the longitudinal sleepers. The space is supplied with mortar which is a mixt. of clay-like lime, cement and cement with a high percentage i.e. 40 per cent of aluminium oxide and 7 per cent silicic acid. There is also a binding agent liq. e.g. water. The clay-like lime is pref. marl.</p>
申请公布号 NL8501785(A) 申请公布日期 1987.01.16
申请号 NL19850001785 申请日期 1985.06.20
申请人 B.V. INTERNATIONALE BOOR- EN HANDELSMAATSCHAPPIJ TE SCHIJNDEL. 发明人
分类号 E01B27/18;(IPC1-7):E01B27/18;E01B27/14 主分类号 E01B27/18
代理机构 代理人
主权项
地址