摘要 |
<p>Arrangement and method for the construction-time use of an elevator, which arrangement comprises an elevator car (2), hoisting roping (4), a hoisting machine fitted to move the elevator car via the hoisting roping (4), which hoisting machine is preferably disposed on the machine room level (22) at the top end of the elevator hoistway, a counterweight (56), and which elevator comprises compensating roping (10), which compensating roping is connected to the supply storage (16) of the compensating roping. In the arrangement, the compensating roping (10) is connected to the elevator car via a diverting pulley (28) on the elevator car and to the counterweight (56) via a diverting pulley (58) on the counterweight (56). In the method one or more jumps of the machine room level are performed, and the additional rope needed for a jump of the machine room level is taken from the supply storage of the compensating roping. The construction-time roping of the elevator is arranged such that the compensating roping is connected to the elevator car (2) via the diverting pulley (28) on the elevator car (2) and to the counterweight (56) via the diverting pulley (58) on the counterweight (56).</p> |