发明名称 BUILDING METHOD FOR BANKING WHERE TUNNEL CONSTRUCTION IS PLANNED
摘要 PURPOSE:To eliminate a primary covering work and to reduce a term of works and decrease a construction cost, by a method wherein an arched ground zone is built at the peripheral wall part of a planned site of a tunnel by the use of a compression resistant banking material, and a number of second burying nets are horizontally laid in the arched ground zone. CONSTITUTION:A first burying net 4 at a first stage is horizontally laid on a ground 2, a primary layer banking material 5 is laminarily piled up for rolling- compaction, and in the following works, the above is repeated to build a banking 1. In which case, an arched ground zone 6 is built at the peripheral wall part of a planned site of a tunnel 3 by the use of a banking material 5a having excellent resistance to compression, and a number of second burying nets 7 and 8 are horizontally buried in the arched ground zone 6. Thereafter, the tunnel 3 is excavated, the first burying net 4 is cut for removal. Further, a compression resistant banking material 2a and the burying nets 4, 7, and 8 at the peripheral wall part of the planned site of the tunnel 3 can eliminate a primary covering work.
申请公布号 JPS61270420(A) 申请公布日期 1986.11.29
申请号 JP19850110688 申请日期 1985.05.23
申请人 TEKKEN KENSETSU CO LTD 发明人 HORIMATSU KAZUO
分类号 E02D17/13;E02D17/18;E02D29/045;E02F5/02;E21D9/04 主分类号 E02D17/13
代理机构 代理人
主权项
地址