发明名称 |
SLOPE CONSTRUCTION WORK FOR ROAD SHOULDER |
摘要 |
PURPOSE:To shorten the period of operations by a method in which a fixing pile is driven through the pile hole of a side block into the ground, and the suspension beams of the side block are extended to one corner of brim blocks and connected to anchor beams. CONSTITUTION:Plural brim blocks 3 are set in parallel on the side of a paved portion 1, and side blocks 4 are set in parallel on the outside of the brim blocks 3. The suspension beams 7 of the side blocks 4 are connected to a hook-shaped anchor beams 6 extended to one corner of the brim blocks 3. Fixing piles 8 are driven through the pile holes of the side blocks 4 into the ground. Cement mortar 9 is then packed into the joints of the blocks 3 and 4 and the aperture between the pile holes 5 and the fixing piles 8 for sealing up. |
申请公布号 |
JPS61176718(A) |
申请公布日期 |
1986.08.08 |
申请号 |
JP19850018185 |
申请日期 |
1985.01.31 |
申请人 |
FUKUHOU BLOCK KOGYO KK;FUKUHOU CONCRETE KOGYO KK |
发明人 |
NAKAMURA MASAYUKI |
分类号 |
E01C5/06;E01C11/22;E02D17/20 |
主分类号 |
E01C5/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|