发明名称 |
CONSTRUCTION OF CELL AT GREAT DEEP OF WATER |
摘要 |
PURPOSE:To permit a cell to be constructed at great deep point under water by a method in which a filling soil mixed with a hardener and an additive is charged into a shell, and the starting time of hardening of the filling soil is regulated according to the charging speed. CONSTITUTION:After a steel sheet pile cell 7 is set on the foundation mound 4, an underwater feeding tube 6 is built in the cell 7. A filling soil mixed with a hardener and an additive is charged through the tube 6 into the cell 7. The starting time of hardening of the filling soil is regulated according to the charging speed in such a way as to control the tensile stress to be generated in the cell 7 crust by the side pressure of the filling soil of unhardened upper layer 2 not to exceed an allowable stress over the whole of the cell crust. |
申请公布号 |
JPS61142219(A) |
申请公布日期 |
1986.06.30 |
申请号 |
JP19840262162 |
申请日期 |
1984.12.12 |
申请人 |
NISHIMATSU KENSETSU KK;NIPPON KOKAN KK <NKK>;PENTA OCEAN CONSTR CO LTD |
发明人 |
NISHIHIRA FUKUHIRO;INABA TSUTOMU;DOBASHI YOSHITERU;WAKAMATSU SEIJI;KATO AKIHISA |
分类号 |
E02D5/04;E02B3/06;E02D27/30 |
主分类号 |
E02D5/04 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|