发明名称 CONSTRUCTION WITH BUILT-IN PILE, AND EXCAVATING APPARATUS
摘要 PURPOSE:To obtain a strong bearing power for a pile at the tip, by a method wherein a slot is excavated with an excavating appartus and the bottom of large diameter is formed in the excavated slot and cement milk is injected into the slot and after that, a concrete pile provided with an enlarging head is set in a settling state to be integrated with the cement milk. CONSTITUTION:Mud is consolidated inside the circumference of the wall face of a slot 12 by a pressure-applying cutter 6 and a stirring cylinder 9 for an excavating apparatus 1, and the slot 12 is excavated to the specified depth. Then, the bottom of large diameter is formed in the excavated slot 12 by reversing the excavating apparatus 1, and the apparatus 1 is pulled out injecting cement milk 10 to the bottom of the slot 12 through the lower end of a hollow shaft 3. And a pile 14 is set in a settling state in the created slot 12 on being rotated, and an enlarging head 12 is built in the cement milk 10 at the bottom of the slot 12 to be integrated and fixed together. As a result, a slot can be bored through ground of any soil very smoothly, and the sectional area of the tip of the pile is remariably enlarged, and a strong bearing power for the pile can be obtained.
申请公布号 JPS6136419(A) 申请公布日期 1986.02.21
申请号 JP19840154109 申请日期 1984.07.26
申请人 TOYO PAIRU FUME KAN SEISAKUSHO:KK;TOUPARU GIJUTSU KENKYUSHO:KK 发明人 SUGIYAMA ISAO
分类号 E02D7/00;E02D5/62;E21B7/00 主分类号 E02D7/00
代理机构 代理人
主权项
地址