发明名称 CONSTRUCTION WORK FOR CUT-OFF WALL
摘要 PURPOSE:To simply construct a cut-off wall by vertically and horizontally stacking up sandbags formed by packing a hydraulic powdery granules into a bag made of porous material. CONSTITUTION:A hydraulic powdery granule 2 (e.g., of Portland cement, etc.) is packed into a bag 1 of a porous material (e.g., jute fiber cloth, canvas, etc.) of meshes to form a sandbag 3. A large number of the sandbags 3 are horizontally and vertically stacked up in a multistage and in a multi-row on the broken places of a dam, etc. Then, the hydraulic powdery granules 2 go out and diffuse from the sandbags 3 and harden hydraulically among the sandbags 1 to form a sealed wall or cut-off wall.
申请公布号 JPS60253611(A) 申请公布日期 1985.12.14
申请号 JP19840110388 申请日期 1984.05.29
申请人 HOUSHIN SEISAKUSHO:KK 发明人 YOSHIDA TOSHIAKI
分类号 E02B3/04;E02B3/12;(IPC1-7):E02B3/04 主分类号 E02B3/04
代理机构 代理人
主权项
地址