摘要 |
PURPOSE:To cut down the costs of air conditioning and construction by a method in which banking soil is packed into the frames of strip footing and compacted, a synthetic resin thin sheet is closely laid on the compacted oil, and concrete layer is formed on the sheet. CONSTITUTION:Banking soil 2 is packed into the frames of strip footing 1 and compacted well, a vinyl sheet 3 is closely laid on the soil 2, and concrete is placed on the sheet 3 to form a concrete layer 4. After the concrete layer 4 is hardened and dried, mats 10 are closely laid on the concrete layer 4. Since geothermal heat can be sufficiently utilized, the cost of air conditioning can be saved, and strong foundation can be constructed at low cost. |