发明名称 METHOD AND DEVICE FOR PRODUCING PILES BUILT IN PLACE
摘要 Making bored piles in stages (step-by-step method) while accurately adjusting reinforcement and concreting sleeves without ground water being able to penetrate into the concreting sleeve and without a lateral discharge of concrete from the concreting sleeve at construction joints being possible. After the casing tube is inserted and emptied, the reinforcement is let down on the plumb rod and is anchored in the ground. The base of the pile is then concreted. The concreting sleeve is put into the still fresh concrete of the pile base so that its bottom edge is sealed off by concrete. The concreting of the rest of the pile takes place later, and, in order to pull the concreting sleeve out of the already hardened concrete of the pile base, the concreting sleeve consists of two shells which are connected at the base in an articulated manner and can therefore be expanded at the head of the concreting sleeve. Field of application: making foundation piles. <IMAGE>
申请公布号 HUT35302(A) 申请公布日期 1985.06.28
申请号 HU19830001850 申请日期 1983.05.25
申请人 BAUAKADEMIE DER DEUTSCHEN DEMOKRATISCHEN REPUBLIK,DD 发明人 SCHMIDT,WERNER,DD;PRAMSCHIEFER,KLAUS,DD
分类号 E02D5/38;E02D5/50;E02D5/62;E02D7/22 主分类号 E02D5/38
代理机构 代理人
主权项
地址