摘要 Tunnels are constructed by freezing soil and removing frozen soil between starting and end shafts of the tunnels. Tunnels are driven in an uncomplicated manner in rapidly changing soils without auxiliary construction means. A hole is bored in or near the planned axis of the intended tunnel between starting and end shafts. A soil freezing work pipe is inserted into the hole. The pipe is cooled by a cooling agent. The soil freezing work pipe continues to be cooled until an ice and frozen soil mass has formed around the work pipe, which frozen mass has a diameter which is larger than that of the planned tunnel. Frozen soil is subsequently excavated, leaving a frozen soil lining, which is immediately supported by a primary support lining or a permanent lining.
申请公布号 US4516878(A) 申请公布日期 1985.05.14
申请号 US19820425200 申请日期 1982.09.28
申请人 LINDE AKTIENGESELLSCHAFT 发明人 REBHAN, DIETER
分类号 E02D19/14;(IPC1-7):E02D19/14;E21D1/06;E21D9/00 主分类号 E02D19/14