摘要 |
<p>A method of constructing a structure of reinforced concrete is disclosed. Two side wall units (1, 10, 11) are installed and beams (14) are bridged therebetween. On the beams (14), a plurality of prefabricated horizontal wall units (22) are placed. Thereafter, the horizontal wall units (22) are joined to each other, and at the same time joined to the beam, with the use of concrete.</p> |