发明名称 METHOD OF CONSTRUCTING LANDSLIDE PROTECTION WALL HAVING NEWEL PILE
摘要 PURPOSE:To prevent loosening of a ground therearound and to increase a cut-off effect, by a method wherein an underground wall of soil cement is constructed, and newel piles, such as H-shape members, are driven at arbitrary intervals through the underground wall more deeply than the underground wall. CONSTITUTION:A soil cement wall 5 made of mixture of excavated earth and a cementing material, such as cement milk, is built to construct an underground wall 2 in a manner that the end parts are partially overlapped with each other. Thereafter, primer piles 3, such as H-shaped members, are driven in the underground wall 2 at arbitrary intervals. the newel piles 3 are driven more deeply than the underground wall 2 so that the lower ends thereof are positioned in a level lower by a necessary distance than the lower end of the underground wall 2. This permits reliable cut-off of water and prevention of settlement of a ground of the back of a landslide protection wall, and enables prevention of collapse of earth through endurance of an earth pressure and a water pressure with the aid of the newel piles.
申请公布号 JPS6065825(A) 申请公布日期 1985.04.15
申请号 JP19830175511 申请日期 1983.09.22
申请人 ASUKU KENKYUSHO:KK 发明人 KUNITOU MITSUHIRO
分类号 E02D5/20;E02D5/04;E02D5/18;E02D17/13;E02F5/02;E02F5/04 主分类号 E02D5/20
代理机构 代理人
主权项
地址