发明名称 FORMATION WORK OF CUT-OFF WALL AND SHEET PILE THEREFOR
摘要 PURPOSE:To form cut-off walls with good efficiency by a method in which three- connected holes are excavated and filled with soil cement in a repeated manner, a sheet pile consisting of two struts and a cut-off plate provided between the struts is orderly penetrated into the connected holes. CONSTITUTION:Three-connected holes 12 consisting of three round pits 11 are excavated by an excavator woth three stirring and excavating rods. Soil cement 13 is formed in the pits 11. In the same way, the connected holes are continuously formed. A sheet pile 1 consisting of two struts 2 and 2' with couplers 4 and 4' and a cut-off plate 3 connected to the upside of the strut 2 is penetrated into the three-connected holes 12 in order while being connected. When the soil cement wall is formed by hardening, the ground is excavated from the upper end to a given height for exposure to form a cut-off wall. The efficiency of the cut- off wall formation work can thus be raised and the amount of the materials used can be saved since the lower part of the cut-off plate is omitted.
申请公布号 JPS6062326(A) 申请公布日期 1985.04.10
申请号 JP19830167593 申请日期 1983.09.13
申请人 KAWAI YOSHIHIKO;SANWA KIZAI KK 发明人 KAWAI YOSHIHIKO
分类号 E02D5/04;E02D5/20 主分类号 E02D5/04
代理机构 代理人
主权项
地址