发明名称 Method of building a bridge arch
摘要 In the method of building a bridge arch, the two halves (7) of the bridge arch, in each case standing in their abutment (11), are concreted or constructed from prefabricated parts from their foot (B) to the apex (C) with the aid of a climbing form or a sliding form. After completion of the two arch halves, these are let down into their final position with the aid of a bracing (10) in the form of steel cables. A reduction of the building costs can be achieved. <IMAGE>
申请公布号 CH645944(A5) 申请公布日期 1984.10.31
申请号 CH19790010994 申请日期 1979.12.12
申请人 BUNG (INGENIEURBUERO) GEMEINSCHAFT BERATENDER INGENIEURE 发明人 FERLE, STANKO
分类号 E01D21/08;(IPC1-7):E01D21/04;E01D7/00 主分类号 E01D21/08