发明名称 CONSTRUCTION OF UNDERGROUND PILE
摘要 PURPOSE:To strengthen the foot protection of an underground pile by a method in which a cylinder for a pile and an earth auger, after reaching a given depth, are pulled up, and a solidifying agent is injected and pressed down under the condition that soil and sand are left in the cylinder for pile. CONSTITUTION:After a cylinder 1 for a pile is penetrated to a given depth while excavating the ground by an earth auger 5, the cylinder 1 and the earth auger 5 are pulled up while injecting cement milk (a). Afterwards, the rotation of the cylinder 1 and the earth auger 5 are stopped, and under the condition that excavated soil is left in the cylinder 1, the cylinder 1 is repenetrated to an initial penetration depth. When the earth auger 5 is then pulled up, the cylinder 1 and the ground are integrately combined by cement milk (a) pressingly supplied to the ground at the tip of the pile, and thereby the foot protection of the pile can be exactly completed.
申请公布号 JPS59170320(A) 申请公布日期 1984.09.26
申请号 JP19830045563 申请日期 1983.03.16
申请人 KUBOTA TEKKO KK 发明人 TAKAOKA TSUTOMU;OOKI KENJI;KANAMORI MASASHI
分类号 E02D5/50;E02D5/62;E02D7/00 主分类号 E02D5/50
代理机构 代理人
主权项
地址