发明名称 PROCEDE ET INSTALLATION POUR LA STABILISATION DE L'INFRASTRUCTURE DESLITS DE BALLAST DES VOIES FERREES
摘要 The sub-grade of a railroad ballast bed is stablized by depositing sand on the bed, removing the sand and ballast in admixture with an excavating bucket conveyor until the sub-grade has been exposed, the sand and ballast are separated from each other on a screen which receives the admixture, and two endless conveyors mounted below the screen convey the separated sand and ballast to the exposed sub-grade to deposit the separated sand thereat at a point ahead of a succeeding point where the separated ballast is deposited, thus depositing the ballast on a layer of sand interposed between the sub-grade and the ballast.
申请公布号 RO80993(A) 申请公布日期 1984.07.17
申请号 RO19740077705 申请日期 1974.02.16
申请人 FRANZ PLASSER BAHNBAUMASCHINEN INDUSTRIEGESELLSCHAFT,AT 发明人 THEURER,JOSEF,AT;FOLSER,KARL,AT
分类号 E01B27/06;E01B27/02;E01B27/10;E01B27/18 主分类号 E01B27/06