摘要 |
The molding method for a cement-mortar comprises; (a) supplying molding stuffs by the first positioned lower mold; (b) arranging the second positioned upper mold vertically to the first in a row; (c) pressing the upper and lower molds by a high pressure cylinder to remove water from the molding stuffs by a inhalating force acting on the upper section; (d) separating the lower mold from the molding stuffs attached to the upper mold; (e) transferring the molded stuffs to a conveyor after removing the inhalating force with the upper mold arranged in a row with the conveyor; (f) returning the upper mold to the original position.
|