摘要 |
PURPOSE:To provide the functions of the latest automatic charging device and molding line thoroughly and to perform casting continuously and efficiently, by providing the 1st and the 2nd molding lines, 3 rows of charging lines and a conveying line for molten metal. CONSTITUTION:Two rows of molding lines ML1, ML2 are provided, and charging devices are provided in parallel with the line ML1. A charging device Pa travels in parallel with the molding line. Two charging lines PL2, PL3 are provided in a direction perpendicular to the line ML2. Then a conveyor 52 for molten metal into which the molten metal is transferred from a holding furnace 51 travels on the conveying line for molten metal, and transfers the molten metal into the ladle of the charging device Pa at the point P1. The line ML2 is for a high speed and charging devices Pb, Pc are provided respectively to the charging lines PL2, PL3. While the molten metal is charged successively with the charging device Pb, the molten metal is supplied into the charging device Pc at the point R from the conveyor 52. |