发明名称 INSTALLING METHOD FOR MAIN GATE OF DAM
摘要 PURPOSE:To shorten a working period and improve precision, by a method wherein, after assembling and welding work of a main gate is completed beforehand, it is moved to an installation position and secured thereto, whereafter concrete is placed at a stroke from the upper position of the main gate. CONSTITUTION:Rails 2 are first installed at a downstream or an upstream side of an installation position of a dam main gate 1 and within a working area of a crane, a truck 3 is placed thereon, and an assembling and a welding work of outlet works 4, a doorstop 5, a door body 6, and a buffering plate 7 are completed on the truck 3 to form the main gate 1. The rail 2 is extended, the truck 3, whereon the main gate 1 is placed, is moved to an installation position, and after it is positioned to a given height, it is placed and secured to a dam concrete. Simultaneously, concrete is deposited at a stroke from the upper position of the main gate 1.
申请公布号 JPS58123913(A) 申请公布日期 1983.07.23
申请号 JP19820007283 申请日期 1982.01.19
申请人 HITACHI ZOSEN KK 发明人 NAKADA TOSHIJI;IGUCHI SHIGEKI
分类号 E02B7/40;E02B7/20;(IPC1-7):02B7/20 主分类号 E02B7/40
代理机构 代理人
主权项
地址