摘要 |
<p>PURPOSE:To reduce the construction cost of a flank structure of a tank by providing a tank side plate made of steel inside the upper part of the side wall of a pre-stressed concrete structure for facilitating the construction process. CONSTITUTION:An angle 12 is placed on a molding box for construction, and a tank side plate 14 with an anchor 13 at the lower periphery is laid on the anchor 12. After concrete 11 is thrown in and hardened as illustrated by slant lines, PC steel lines 15 are pulled to contract the concrete side wall 11 by DELTAS. By tightening the concrete side wall circumferentially, the tank side plate 14 is also contracted and deformed in its lower part, and both of them can be stuck together more tightly.</p> |