发明名称 Reinforced concrete construction underground - has frames dropped into excavations with positioning detents ensuring continuity
摘要 <p>The method of making underground works in reinforced concrete, near existing buildings involves making, transverse to the future tunnel longitudinal axis, successive rectangular excaVations. In each of these is dropped a frame (4). Before placing the frame in position, complementary parts (5) are fixed to it on the upstream side, relative to a shoulder on the roof, to cover it. These complementary parts are placed in footings up to the shoulder, to form a joint to ensure continuity of the tunnel. Thickness is increased by a covering of concrete.</p>
申请公布号 BE894650(A4) 申请公布日期 1983.04.08
申请号 BE19820209205 申请日期 1982.10.08
申请人 DYNAMIQUE DU BATIMENT EN ABREGE DYNABAT S.A.;S.P.R.L. ETS E. RONVEAUX;LES ENTREPRISES LOUIS DE WAELE S.A. 发明人
分类号 E02D29/045;E02D29/05;E02D29/16;E21D11/08;(IPC1-7):21D/;01C/ 主分类号 E02D29/045