发明名称 Tunnel floor prodn. method - assembles from primary and secondary sections fixed to girders secured to walls
摘要 <p>The method produces a foundation floor for a tunnel or underground structure without having to lower the water table, forming watertight joints between it and walls. The floor (5) is assembled underwater between the vertical tunnel walls (2) and comprises primary and secondary sections with sealing joint strips between them and fixed together by girders (11) with profiled sealing strips (8). The beams are fixed to the tunnel walls, and the watertight joints are formed by injected pockets of gravel, after which the tunnel is pumped dry. FL.</p>
申请公布号 BE895038(A2) 申请公布日期 1983.03.16
申请号 BE19821010646 申请日期 1982.11.17
申请人 N.V. CONSTRUCTIES ELECTRICITEITSWERKEN EN INDUSTRIEBOUW 发明人
分类号 E02D19/06;E02D29/05;E02D29/09;E21D11/38;(IPC1-7):21D/ 主分类号 E02D19/06
代理机构 代理人
主权项
地址