发明名称 SHEATHING WORK BY CONCRETE PARTITION WALL
摘要 PURPOSE:To obtain a stable slope by a method in which frameworks are fixed in concrete parallel crosses formed by placing concrete into parallel crosses grooves provided on a slope, and soil is palced in the frameworks or greens are planted in the frameworks. CONSTITUTION:Horizontal shelves 2 are projectionally provided on the outer upside of upright plates 1 to form side walls 3. The insides of two side walls 3 are faced each other and the side walls 3 are set at proper intervals with spacing bolts 4 to form short grooves 5. A proper number of the short grooves 5 are continuously arrainged vertically and crossly into a parallel crosses form along a slope to form a parallel crosses grooves 6. Then, concrete is placed into the parallel crosses grooves 6 to form concrete parallel crosses-partition walls 7, and frameworks 8 are fixed to the horizintal shelves of the side walls 3. As needed, banking or greens is provided on the slope between the frameworks 8.
申请公布号 JPS57209331(A) 申请公布日期 1982.12.22
申请号 JP19810093642 申请日期 1981.06.16
申请人 TENRIYUU KOGYO KK 发明人 MIYAZAKI JIROU
分类号 E02D17/20;(IPC1-7):02D17/20 主分类号 E02D17/20
代理机构 代理人
主权项
地址