摘要 |
In an installation for transmission of the sensible coke heat of a coke drying cooling chamber (1, 2, 3) in a heat carrier circuit to a coal preheating aggregate (4, 5, 6) and, connected parallel thereto, a waste heat boiler (7, 8, 9), control possibilities are to be afforded for economical waste heat utilisation. In each case at least two coke drying cooling chambers (1, 2, 3), coal preheating aggregates (4, 5, 6) and waste heat boilers (7, 8, 9) situated in heat carrier circuits are provided. The heat carrier circuits are connected and a shut-off member (17, 18) is provided before each of the coke drying cooling chambers (1, 2, 3), coal preheating aggregates (4, 5, 6) and waste heat boilers (7, 8, 9). <IMAGE>
|
申请人 |
DIDIER ENGINEERING GMBH, 4300 ESSEN, DE |
发明人 |
GALOW, MANFRED;JOSEPH, HORST G.;FLOCKENHAUS, CLAUS, DR., 4300 ESSEN, DE |