摘要 |
<p>No interruption to train traffic travelling on adjacent tracks is caused by transport of track and track construction material to and from a track construction site. The machine includes a chassis unit (2), equipped with a hoist device (5). travelling on a main track (3), together with a conveyor wagon (9) travelling on an auxiliary track (8) laid ahead of the main track on site (1). On one side of this wagon is a service position, while its loading deck serves to accommodate a container (11). Another auxiliary track (12) is fitted above the chassis unit and/or one or more following wagons (4), for the conveyor wagon or another one.</p> |