摘要 |
PURPOSE:To prevent clogging and erosion of tuyeres by titling a converter after top blowing and blowing a gas through a tuyere immersed in the molten metal by this. CONSTITUTION:First, top blowing is carried out with a top blowing lance 2. At this time, there is no need for blowing the gas through a tuyere 3, but if there is the danger of causing clogging owing to scattering or the like of molten steel 4, a small flow rate of gas may be blown. After the end of the top blowing, a furnace body 1 is titled to immerse the tuyere 3 into the molten steel 4, then the gas is blown through the tuyere 3. This gas may be one or more kinds of inert gases such as N2 and Ar, CO2 or O2. Thereby, the stirring of the molten steel 4 and slag 5 is accomplished. |