发明名称 Damming for enhanced mine-working gallery durability - involves sheathing and filling between plinth and roof, and embedding wooden piers
摘要 <p>The gallery support lining is sealed towards the long face by mat warping and oilcloth, where a process is applied for enhancing durability of work face galleries, esp. in sloping deposits. The accompanying barriers are constructed from rapidly hard-setting materials. The gallery, in the form of base gallery (1), has a plinth (4) made of damming material inserted in it, before passage of the long face between the gallery bottom (2) and seam floor (3). After passage through the long face, the gap between plinth and gallery ridge is sheathed (11) and filled (5) to a depth of at least 2.5m. Timber piers are also set in position between long face roof and floor, embedded in the barrier. This permits preservation of full gallery width, with improved atmosphere and more effective gas extraction while costs are reduced.</p>
申请公布号 DE3022223(A1) 申请公布日期 1981.12.24
申请号 DE19803022223 申请日期 1980.06.13
申请人 RUHRKOHLE AG 发明人 BRAEMER,LOTHAR
分类号 E21D11/00;E21F15/00;(IPC1-7):21D11/00 主分类号 E21D11/00
代理机构 代理人
主权项
地址