摘要 |
A method for blast destruction of ledge of hard rocks with placement of two additional jet mono-charges with end linear two-facet charge hollow in well: first at bottom of well, and second one – at upper edge of column of well charge, and third with long charge hollow – at the level of bench toe. The method makes it possible to increase effectiveness of blast destruction of rocks. |