发明名称
摘要 PURPOSE:To carry out the title galvanizing of high productivity without requiring complex equipment by fitting predetermined plugs to both ends of a steel pipe and removing zinc remanining on the pipe inside by blowing immediately after galvanizing. CONSTITUTION:Plugs 2 made of lead or its alloy are fitted to both ends of steel pipe 1, and the pluged pipe is dipped in a pickling vessel or the like to remove rust. The pipe is then introduced into galvanizing bath 5 provided with floating molten flux 7 at inlet side 11 by means of steel pipe support members 10 of rotating body 9 to galvanize the pipe surface. The galvanized pipe is pulled out of galvanizing vessel 6, and zinc adhered to the pipe inside by dissolution of pulgs 2 in the bath is removed thoroughly by blowing steam or air.
申请公布号 JPS5621346(B2) 申请公布日期 1981.05.19
申请号 JP19780048320 申请日期 1978.04.25
申请人 发明人
分类号 C23C2/06;B05D1/32;C23C2/00;C23C2/38 主分类号 C23C2/06
代理机构 代理人
主权项
地址