摘要 |
PURPOSE:To contrive efficient control and energy saving, by classifying power load into specified ranks based on an air conditioning data, and by controlling the power load in order rank by rank at the time of demand signal generation. CONSTITUTION:A terminal monitoring control section 4 is provided with temperature sensors 2, 3, and from the signal, the power load 1 of an air conditioner is controlled via a driving section 6. The terminal monitoring control section 4 is under the control of a main control section 10 via a transmission line. In the main control section 10, the power load to be interrupted according to the level of power demand is classified according to a room temperature level, a forcible interruption block, and the like, and is previously transmitted to the terminal monitoring control section 4, and by a demand monitoring section 12, the level of actual power demand is measured, and signal is transmitted to the terminal monitoring control section 4. By the terminal monitoring control section 4, according to these informations, the corresponding power load 1 is interrupted. |