发明名称 FORFARANDE OCH ANORDNING FOR GRUNDLEGGNING AV FOR TILLVERKADE ANLEGGNINGAR I LAND
摘要 The invention refers to a procedure for laying the foundation of prefabricated plants (7) comprising such types as processing plants, industrial buildings, hospitals, hotels, etc., and for their removal, assembly and foundation building at the place of destination (10) ashore. …<??>Foundations (4) are made ashore or in a dry dock or on a barge, after which the processing plant is assembled. If the foundation is manufactured outside the barge (1), the plant (7) and/or foundation (4) can be moved to transport barges (1). Transport to the place of destination is carried out by means of sea-going transport barges (1). At the place of destination (9) the transport barges (1) are lowered onto an erection bed (2), and the plant (7) is launched over prefabricated sliding supports (5) from transport barge to the definitive erection site (10), which can advantageously be situated above the water level in the vicinity of the beach (9) or ashore.
申请公布号 SE417342(B) 申请公布日期 1981.03.09
申请号 SE19790000955 申请日期 1979.02.05
申请人 * NYA ASFALT AB 发明人 C * CAPPE
分类号 E02B3/04;E02B17/00;E02D23/02;E02D27/32;E04B1/35;E04G23/06;E04H1/00;E04H3/08;E04H5/02;(IPC1-7):02D27/32 主分类号 E02B3/04
代理机构 代理人
主权项
地址