发明名称 METHOD AND DEVICE FOR CONSTRUCTING GROUND IMPROVEMENT PILE
摘要 PROBLEM TO BE SOLVED: To efficiently form a ground improvement pile with a diameter large enough to support a building.SOLUTION: A method for constructing a ground improvement pile comprises the steps of: excavating a foundation G downward to a predetermined depth by a rotary excavation jig 5 with a first diameter; excavating the foundation G upward by a rotary excavation jig 7 with a second diameter larger than the first diameter; and packing a filler in an excavation hole H excavated in the respective steps and mixing the excavated sediment generated by excavation with the filler and hardening the mixture so as to form an improvement pile with a predetermined depth. In the method, in the case where an adjacent excavation hole H is already formed, at the time of excavating by the rotary excavation jig 5 with the first diameter, the outer peripheral edge of the rotary excavation jig 5 with the first diameter and the adjacent excavation hole H are separated.SELECTED DRAWING: Figure 1
申请公布号 JP2016130404(A) 申请公布日期 2016.07.21
申请号 JP20150004208 申请日期 2015.01.13
申请人 FUJII TOSHIHIKO 发明人 FUJII TOSHIHIKO
分类号 E02D3/12;E02D5/46 主分类号 E02D3/12
代理机构 代理人
主权项
地址