发明名称 LOAD CONTROLLER, LOAD CONTROL SYSTEM, LOAD CONTROL METHOD, AND PROGRAM
摘要 PROBLEM TO BE SOLVED: To provide a load controller, load control system, load control method, and program that are capable of activating a load by using settings before occurrence of outage, after power return of a commercial power supply.SOLUTION: A load controller of an embodiment includes a setting value acquisition unit, a load control unit, and a setting restoration unit. The setting value acquisition unit acquires, from loads that consume power to operate, setting values to be used for the loads operating, during a period in which power is being supplied from a commercial power supply. The load control unit, during a period in which power supply from the commercial power supply has stopped and power is being supplied from a power generator, activates loads selected from a plurality of loads under the condition that the total value of power to be consumed by the activated load does not exceed a target power value showing a value based on power capable of being supplied by the power generator. The setting restoration unit, when power return of the commercial power supply has been performed, outputs the setting values acquired by the setting value acquisition unit to the loads.SELECTED DRAWING: Figure 2
申请公布号 JP2016163360(A) 申请公布日期 2016.09.05
申请号 JP20150036894 申请日期 2015.02.26
申请人 TOSHIBA CORP 发明人 SHIMOSATO KOICHI;ASAZUMA TOMOHIRO
分类号 H02J9/08;H02J3/14;H02J3/38;H02J13/00 主分类号 H02J9/08
代理机构 代理人
主权项
地址