发明名称 Staged multi-span concrete bridge superstructure - has front part constructed initially as light partial width unit, completed when forwarded
摘要 <p>The superstructure is made at a production point sited behind the abutment, in sections. It is thrust forward into the final position across the supports, with measures taken to reduce support moments, in construction of a reinforced or prestressed concrete bridge, esp. with a number of equal spans. Over a limited length, the leading part of the superstructure is made in the form of a part cross-section, of moderate weight. This is completed to fully cross-section only on attaining the final position. No elaborate auxiliary appliances are needed, to reduce structural moment.</p>
申请公布号 DE2939996(A1) 申请公布日期 1980.07.24
申请号 DE19792939996 申请日期 1979.01.23
申请人 WAYSS & FREYTAG AG 发明人
分类号 E01D21/06;(IPC1-7):01D21/04 主分类号 E01D21/06
代理机构 代理人
主权项
地址