摘要 |
<p>The good or personnel lift control system uses cables for the input and transmission of controls signals containing data and commands. These signals are transmitted between individual control positions by a main cable (3) with one to two cores, and processed by microprocessors. The central control unit in the machine room (O) can be connected by a one- or to-core main cable in the lift shaft with the pushbutton-, indicator- and storage units (4) at the different floors, and by a further such cable contained in the hanger cable (8) to those (5) in the cage (9), transmitting and processing the data and commands contained in the control signals.</p> |