摘要 |
To cover peak loads an auxiliary circuit having a water store which can be charged from the main circuit is connected to the main circuit of a thermal power station. The stored energy carrier is expanded by throttling, whereupon the vaporous part performs work in a peak-load turbine or in part of the main turbine, which is designed for this purpose, while the unvaporized part is returned to the main circuit in such a way that the low-pressure bleed points of the main turbine are relieved and the output of the main turbine is thus increased. The water store is preferably fed with condensate from the reheater. |