发明名称 Tunnel wall erection procedure - has wall divided by continuous seams filled with consolidating substance permitting movement for balanced condition
摘要 <p>The wall construction erection procedure is specially for tunnel walls, which in the load condition are exposed to forces which influence shape and position changes through the wall construction. The space i.e. the seam between the back wall of the construction and the soil is filled in with a consolidating substance. The wall construction is split up by corresponding continuous seams and these are filled with the consolidating substance in suitable amounts. These can be a relative movement of the components until the wall construction is in a roughly balanced condition. The seams are then closed off at their open ends by the natural consolidation of the consolidating layer.</p>
申请公布号 DE2055955(B2) 申请公布日期 1979.10.11
申请号 DE19702055955 申请日期 1970.11.13
申请人 UT- VASUTTERVEZOE VALLALAT, BUDAPEST 发明人 BALOGH, JOZSEF, DIPL.-ING., BUDAPEST
分类号 E02B3/16;E21D11/00;(IPC1-7):02B3/16;21D11/38;01C11/02;02D31/02 主分类号 E02B3/16
代理机构 代理人
主权项
地址