发明名称 Concrete highway slab crack filling process - involves grinding dovetail section channel on crack line and filling with elastic or plastic strip
摘要 <p>The grinding and filling process is for utilization in the filling of cracks in concrete slabs e.g. highway pavements. The process involves grinding a groove in the surface of the concrete and along the line of the crack. The groove has a dovetail cross-section and is then filled with a strip of elastic or plastic material. The section of the groove is designed to avoid deterioration and debonding of the filler under thermal movements etc. The grinding operation may require the making of two oblique incisions on opposite sides of the crack, and the grinder may be inclined at 30 degrees to the vertical.</p>
申请公布号 FR2404724(A1) 申请公布日期 1979.04.27
申请号 FR19770029444 申请日期 1977.09.30
申请人 HAYAT ROGER 发明人
分类号 E04G23/02;(IPC1-7):04G23/02 主分类号 E04G23/02
代理机构 代理人
主权项
地址