发明名称 Blast furnace with four regenerative heaters - where computer calculates fuel gas required for reheating
摘要 <p>A gp. of four regenerative blast heaters are alternately operated for a blast furnace, where one heater(a) is driven at full blast during the middle of the blow, and another (b) is driven in a choked condition at the beginning or end of the blast. The amt. of hot gas for reheating heater(a) is computed by continuous monitoring of total heat removal (QG) from the gp., via. the total vol. (VKWG), temp. (TKW) and humidity(FKW) of the cold wind (KW); and the temp (TMW) of the hot wind. Heat removed from heater(a), viz. QC is continuously monitored via VKWC; TKW; and FKW of the cold wind fed to heater(a); and the temp.(THWC) of the hot wind removed from heater(a). The difference QG - QC = Q1 is calculated, where Q1 is the heat removed from heater(b). The values QC and Q1 are continuously integrated for each heater during the blast period. Computer-controlled operation of the blast heaters which allows for the relatively high and low temps. at the beginning and end of the blast supplied by each of the four heaters.</p>
申请公布号 DE2643393(A1) 申请公布日期 1978.03.30
申请号 DE19762643393 申请日期 1976.09.27
申请人 HERMANN RAPPOLD & CO GMBH 发明人 MUELLER,RUDOLF;SEEGER,JOSEF;FINK,KONRAD
分类号 C21B9/00;C21B9/10;(IPC1-7):C21B9/10 主分类号 C21B9/00
代理机构 代理人
主权项
地址