摘要 |
Mounted on the boiler framework and on the upper end of the wall pipework (1) is in each case a roll row (18, 31). A chain (50) or a cable is guided alternately via the rolls. A uniform distribution of the load of the pipe wall on the boiler framework is thus achieved. <IMAGE>
|