发明名称 |
FLOOR CLIMBING-TYPE TOWER CRANE AND CONSTRUCTION METHOD FOR BUILDING |
摘要 |
PROBLEM TO BE SOLVED: To efficiently perform a restoration step of closing an opening for passage of a mast, by reducing a burden on a worker, when a building is constructed by using a floor climbing-type tower crane.SOLUTION: A hoist type crane 41 is installed in a lower part of a trestle 20 for supporting a floor climbing-type tower crane. In a space formed by an opening 8 for passage of a mast directly below the floor climbing-type tower crane, lifting is performed by the hoist type crane 41.SELECTED DRAWING: Figure 3 |
申请公布号 |
JP2016108120(A) |
申请公布日期 |
2016.06.20 |
申请号 |
JP20140248398 |
申请日期 |
2014.12.08 |
申请人 |
SUMITOMO MITSUI CONSTRUCTION CO LTD |
发明人 |
SAKO JUNJI;HIRANO HIDEKAZU;MINAMI KEISUKE;KUROKAWA HISANORI;YANO SHOHEI;FUNABASHI NAOKI |
分类号 |
B66C23/32;B66C17/06;E04G21/14 |
主分类号 |
B66C23/32 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|